State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: PIPARHA
Work Code: 1713004013/WC/22012034923700 (Talab Jirnoddhar karya Sonaau Talab)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2022 Work start date : 10/3/2022
Present status : Existing Proposed Status : Renovtion of Community Ponds for Comm
Tech Sanction Details
Technical Sanction No. : 4013/310 Sanction Date : 14/2/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost 15th Finance Commission scheme2 scheme3 Total
150000 0 0 0 143000 0 0 143000 0 293000
Financial Sanction Details
Financial\Administrative Sanction No: 4013/1242 Financial\Administrative Sanction Date 28/2/2022
Fin. Sanc. Amt. (in Rs) NREGA:150000 15th Finance Commission
143000
Scheme 2
0
Scheme 3
0
Total
293000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard130003000
2Site clearance, cutting grass, raking into heaps and removing off the premises1237.056.658226.3825
3Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil390.33181.5670868.3148
4Dag-beling-Single spade stroke minimum 75mm deep3000.38114
5Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead195.1711.162178.0972
622cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014222.64372.2682879.9664
7Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 390.332.39932.8887
8Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock.222.64242.2853941.2192
9Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.390.33111.7543619.3775
10Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making390.3321.18235.963
11FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders111.23163.5718193.8911
Total Activity 293000
S.NoMaterialQuantityUnit PriceTotal
1contigency130003000
2Loosening Machine Rent390.3320.898153.9937
3pitching stone222.64405.9190371.8024
4Roller390.3319.627658.2746
5SIGNBOARD135303530
6Soil Transportation390.3375.5429485.5282
7Water Transportation390.330.2285.8726
Total Material 143000