S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 3000 | 3000 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 1237.05 | 6.65 | 8226.3825 |
3 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 390.33 | 181.56 | 70868.3148 |
4 | Dag-beling-Single spade stroke minimum 75mm deep | 300 | 0.38 | 114 |
5 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 195.17 | 11.16 | 2178.0972 |
6 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 222.64 | 372.26 | 82879.9664 |
7 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 390.33 | 2.39 | 932.8887 |
8 | Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock. | 222.64 | 242.28 | 53941.2192 |
9 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 390.33 | 111.75 | 43619.3775 |
10 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 390.33 | 21.1 | 8235.963 |
11 | FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders | 111.23 | 163.57 | 18193.8911 |