S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 1957.5 | 6.64524137931034 | 13008.06 |
2 | Providing stone chips under stone pitching | 315 | 454.879238095238 | 143286.96 |
3 | (a) Other then black trap Basalt or granite | 93.69 | 301.756857722276 | 28271.6 |
4 | (a) Consolidation of Moorum /earth work (rate for 1Cum. of Moorum /earth work) | 3399.76 | 2.38836859072405 | 8119.88 |
5 | (XI) 6 Km. Lead | 93.69 | 262.241434518092 | 24569.4 |
6 | (III) 1.5 Km. Lead | 1126.13 | 77.9290845639491 | 87758.28 |
7 | (XII) 7 Km. Lead | 2091.38 | 179.095984469585 | 374557.76 |
8 | (XV) 10 Km. Lead | 182.25 | 210.634293552812 | 38388.1 |
9 | (a) Boulders | 75 | 576.088133333333 | 43206.61 |
10 | For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc. | 182.25 | 428.469245541838 | 78088.52 |
11 | Hearting, casing/cut off filling soil etc.
At optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/ vibratory compacters including watering, required leads and lifts and material etc. complete. | 3399.75 | 21.785078314582 | 74063.82 |
12 | a (iii) Loose or soft soil for Tank Work | 48.4 | 100.971487603306 | 4887.02 |
13 | b (iii) Dense or hard soil for Tank Work | 1126.13 | 136.305648548569 | 153497.88 |
14 | c (iii) Hard moorum for Tank Work | 2147.54 | 181.55950529443 | 389906.3 |
15 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 65 | 577.446461538462 | 37534.02 |