Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 05:23:14 PM 
Back  
State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: TEHRA
Work Code: 1713004025/RC/1493 (गेवल मार्ग निर्माण रामसिया पाण्‍डेय के घर से भवनिय)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2012 Work start date : 16/5/2012
Present status : No Road Proposed Status : Sand Moram
Tech Sanction Details
Technical Sanction No. : 1/1493 Sanction Date : 15/5/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
280000 166000 0 0 0 0 0 166000 0 446000
Financial Sanction Details
Financial\Administrative Sanction No: 1/60 Financial\Administrative Sanction Date 16/5/2012
Fin. Sanc. Amt. (in Rs) NREGA:446000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
446000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Ordinary shrub jungle (areas below 25% covered by shrubs) clearance involving removal of grass. Shrubs, bushes and twigs, excluding uprooting (for survey works)4001.4560
2Work charge12012214640
3Dag-beling-Single spade stroke minimum 75mm deep15000.2300
4Collection of approved soil having CBR not less then 12, including stacking at quarry.17787377873
5Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 2729.254.813100.4
6Transportation of metal 72.09720.0951911.2881
7Korebandi for consolidation work.-30cm wide and 10cm thick.10001.91900
8Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN236.2564.215167.25
9Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor249318.846868.4
10Providing and fixing on Wall face Asbestos Cement building pipe of the following nominal size including jointing with sun yarn soaked in bitumen and cement mortar 1:2 (1cement, 2sand) complete .-100 mm dia.15772.4811587.2
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.249367.8169025.4
12SIGN BOARD115001500
13contingency12000020000
14Labour difference in case of old SoR12118421184
Total Activity 446000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Earth Work249318.846868.4
2contangency and work charges11200012000
3Display board115001500
4pipe ac15722.710840.5
5Rolling Compaction236.2539.69355.5
6Soil transport747.925.7319243.467
7Transpotation of Mooram236.25220.6252121.475
8Trasportaion of water2729.254.813100.4
Total Material 166000