S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Ordinary shrub jungle (areas below 25% covered by shrubs) clearance involving removal of grass. Shrubs, bushes and twigs, excluding uprooting (for survey works) | 400 | 1.4 | 560 |
2 | Work charge | 120 | 122 | 14640 |
3 | Dag-beling-Single spade stroke minimum 75mm deep | 1500 | 0.2 | 300 |
4 | Collection of approved soil having CBR not less then 12, including stacking at quarry. | 1 | 77873 | 77873 |
5 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 2729.25 | 4.8 | 13100.4 |
6 | Transportation of metal | 72.09 | 720.09 | 51911.2881 |
7 | Korebandi for consolidation work.-30cm wide and 10cm thick. | 1000 | 1.9 | 1900 |
8 | Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN | 236.25 | 64.2 | 15167.25 |
9 | Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor | 2493 | 18.8 | 46868.4 |
10 | Providing and fixing on Wall face Asbestos Cement building pipe of the following nominal size including jointing with sun yarn soaked in bitumen and cement mortar 1:2 (1cement, 2sand) complete .-100 mm dia. | 15 | 772.48 | 11587.2 |
11 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 2493 | 67.8 | 169025.4 |
12 | SIGN BOARD | 1 | 1500 | 1500 |
13 | contingency | 1 | 20000 | 20000 |
14 | Labour difference in case of old SoR | 1 | 21184 | 21184 |