State: MADHYA PRADESH District: HARDA Block: HARDA Panchayat: DEWTALAB
Work Code: 1743002015/RC/22012034290207 (आंतरिक पथ निर्माण ग्राम कोलवा से देवतलाब की ओर 900 मीटर रोड)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2015 Work start date : 25/11/2015
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 15/90 Sanction Date : 7/10/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
895000 521000 0 0 0 0 0 521000 0 1416000
Financial Sanction Details
Financial\Administrative Sanction No: 15/9 Financial\Administrative Sanction Date 25/11/2015
Fin. Sanc. Amt. (in Rs) NREGA:1416000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1416000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises90001.816200
2Dag-beling-Double spade "v" shaped stroke 100mm deep27000.51350
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)6.752498.616865.55
4Transportation of metal 3070.58129.51397670.8158
5Transportation of metal 445.5155.3469203.97
6Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms.7.5555.244164.3
7Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.73516.0846161739.68
8Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1000 mm dia.7.54341.632562
9Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making3692.2531.6116675.1
10Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor445.533.514924.25
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work1107.6891.2101020.416
12Collection of soft moorum including stacking at quarry.3070.58126.7389042.486
13Collection of hard moorum including stacking at quarry.445.514765488.5
14contingency12871028710
Total Activity 1416000
S.NoMaterialQuantityUnit PriceTotal
11904 tranportion of rcc hum pi7.51163.068722.95
240 mm metal(1.3.6)6.752004.213528.35
3Board125002500
4compaction of sub grad earthen445.519.648749.62
5contigency15186151861
6pf RCC hume pipe 10007.54148.131110.75
7Rolling Earth & moorum3692.2525.2893340.08
8Transportanion of hard Muram445.5111.0649477.23
9Transportanion of Soft Muram3070.5885.23261705.5334
Total Material 521000