State: MADHYA PRADESH District: DHAR Block: NALCHHA Panchayat: Silotiya
Work Code: 1722005027/WC/22012034445976 (sakan pond nirman samsan ke pass)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 26/1/2019 Work start date : 5/2/2019
Present status : Existing Proposed Status : Construction of Fisheries Ponds for Community
Tech Sanction Details
Technical Sanction No. : 225(18-19) Sanction Date : 25/2/2019
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
344000 86000 0 0 0 0 0 86000 0 430000
Financial Sanction Details
Financial\Administrative Sanction No: 310(18-19) Financial\Administrative Sanction Date 27/2/2019
Fin. Sanc. Amt. (in Rs) NREGA:430000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
430000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard110001000
2Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead158.711.61840.92
3Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m768220168960
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)35.282484.487649.632
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)100158.9515895
6False work for R.C.C. and P.C.C. work in plinth and foundation67.2144.969741.312
7Snowcem or durocem painting of any shade-2 coats on new work238.0570.816853.94
8Site clearance, cutting grass, raking into heaps and removing off the premises6008.85280
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.317.4385.8122452.92
Total Activity 430000
S.NoMaterialQuantityUnit PriceTotal
1PhotoCopy & Stationary142004200
2Transpotation Charges25831781786
Total Material 86000