S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Work charge | 1 | 5373 | 5373 |
2 | Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting) | 258.552 | 23.6 | 6101.8272 |
3 | Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Loose or soft soil | 1292.76 | 52.7 | 68128.452 |
4 | SIGN BOARD | 1 | 2000 | 2000 |
5 | Labour difference in case of old SoR | 434 | 17 | 7378 |