S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 115.88 | 2648.1 | 306861.828 |
2 | Labour only for item no. 0413 (for any proportion of cement concrete) | 115.88 | 427.5 | 49538.7 |
3 | False work for R.C.C. and P.C.C. work in plinth and foundation | 180 | 185.4 | 33372 |
4 | Transportation of metal | 110.7 | 52.11 | 5768.577 |
5 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms. | 98.49 | 112.9 | 11119.521 |
6 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms. | 49.82 | 101.61 | 5062.2102 |
7 | Loading of metal in truck, dumper etc. | 110.7 | 29.73 | 3291.111 |
8 | Unloading of metal in truck, dumper etc. | 110.7 | 13.2 | 1461.24 |
9 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 1 | 41 | 41 |
10 | Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7 | 110.7 | 44.7 | 4948.29 |
11 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 18 | 96.2 | 1731.6 |
12 | Collection of hard moorum including stacking at quarry. | 110.7 | 122.8 | 13593.96 |
13 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil. | 675 | 14 | 9450 |
14 | contingency | 1 | 13386 | 13386 |