S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Contingency | 1 | 732 | 732 |
2 | Dag-beling-Single spade stroke minimum 75mm deep | 150 | 3 | 450 |
3 | Labour only for item no.0406 | 28.13 | 467.3 | 13145.149 |
4 | Labour only for item no. 0413 (for any proportion of cement concrete) | 40 | 458 | 18320 |
5 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 66 | 1000 | 66000 |
6 | Labour only for item no.1035, 1036 and 1037-Raised and cut pointing | 750 | 109.7 | 82275 |
7 | Transportation rates for Masonry stone. | 276.25 | 506.94 | 140042.175 |
8 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 125.31 | 101.34 | 12698.9154 |
9 | Transportation rates for Flag stone 20 to 40 mm thick | 28.13 | 136.7 | 3845.371 |
10 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil | 140.63 | 52.7 | 7411.201 |
11 | Collection of soft moorum including stacking at quarry. | 125.31 | 122.8 | 15388.068 |
12 | Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading-3 (Size ranging from 53 mm to 22.4 mm) | 28.13 | 490 | 13783.7 |
13 | Labour only for Random/ uncoursed rubble masonry in plinth and foundation, stones laid dry, well bounded, faced with selected stones and built with through stones evenly placed at the rate of two per sqm. | 376.25 | 1086.8 | 408908.5 |