State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: BANS
Work Code: 1713004028/WC/101 (कपिलधारा कूप निर्माण रामजी पटेल Ts 101 )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/11/2012 Work start date : 14/11/2012
Present status : Non-existent Proposed Status : Stop Dam
Tech Sanction Details
Technical Sanction No. : 570/28 Sanction Date : 14/11/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
124000 134000 0 0 0 0 0 134000 0 258000
Financial Sanction Details
Financial\Administrative Sanction No: 28/28 Financial\Administrative Sanction Date 14/11/2012
Fin. Sanc. Amt. (in Rs) NREGA:258000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
258000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises000
2Contingency176007600
3Work charge11900019000
4Pumping out water caused by springs tidal or river seepage, broken water mains or drains or well point pumping and the like.6051.63096
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)1.752530.54428.375
6False work for R.C.C. and P.C.C. work in plinth and foundation4.27123.4526.918
7Extra over items pointing on walls for height more then 10m ground level for every additional height of 5m or part there off.160.4464.42210335.86568
8Transportation of metal 50562800
9Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.14500045000
10Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil158.97803209.433289.999482
11Earth work for well excavation including disposal of excavated soil lead upto 20 m. & lift upto 1.5 m., disposed soil to be levelled and neatly dressed. Loose or soft soil. Lift from 2.00 m. to 2.50 m.000
12Earth work for well excavation including disposal of excavated soil lead upto 20 m. & lift upto 1.5 m., disposed to be levelled and neatly dressed. Loose or soft soil. Lift from 2.50 m. to 3.00 m.000
13Earth work for well excavation including disposal of excavated soil lead upto 20 m. & lift upto 1.5 m., disposed soil to be levelled and neatly dressed. Loose or soft soil. Lift from 3.00 m. to 3.50 m.000
14Earth work for well excavation-Lift from 5.50 m. to 6.00 m.000
15Earth work for well excavation including disposal of excavated soil lead upto 20 m. & lift upto 1.5 m., disposed soil to be levelled and neatly dressed. Loose or soft soil. Lift from 3.50 m. to 4.00 m.000
16Earth work for well excavation........Loose or soft soil,lift from 4.00 m to 4.50 m000
17Earth work for well excavation-Lift from 4.50 m. to 5.00 m.000
18Earth work for well excavation-Lift from 5.00 m. to 5.50 m.000
19Earth work for well excavation-Lift from 6.00 m. to 6.50 m.000
20Earth work for well excavationSoil Lift from 1.5 m. to 2.00 m.000
21Earth work for well excavation-Soil lift from 2.00 m. to 2.50 m.000
22Earth work for well excavation-soil lift from 2.50 m. to 3.00 m.000
23Earth work for well excavation-Soil lift from 3.00 m. to 3.50 m.000
24Earth work for well excavation-Soil lift from 3.50 m. to 4.00 m.000
25Earth work for well excavation-Soil lift from 4.50 m. to 5.00 m.11.0200
26Add in item No. 2401 for lift. (In well excavation)-For every 0.50 m after 6.0 m initial depth upto 10.5 m36.3487.713517704.00005
27Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)100.1351.65166.708
28Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Hard moorum68.051590.9108260.745
Total Activity 258000
S.NoMaterialQuantityUnit PriceTotal
120 MM Gitti1.4911501713.5
2Cement12326532595
3Contangancy160006000
4RR stone (Granite)10.89101611064.24
5Rubble Stone57.1692853044.48
6Sand (Filling)24.95115028692.5
Total Material 134000