Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 06:26:28 PM 
Back  
State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: SAGRON
Work Code: 1711003014/IF/310 (कपिल धारा कूप निर्माण कार्य चतुर्भज/गोटीराम गोस्‍व)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 15/8/2011 Work start date : 19/12/2011
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 1370/SG Sanction Date : 12/12/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
231000 146000 0 0 0 0 0 146000 0 377000
Financial Sanction Details
Financial\Administrative Sanction No: 28/SG Financial\Administrative Sanction Date 19/12/2011
Fin. Sanc. Amt. (in Rs) NREGA:377000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
377000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Contingency11449414494
3Work charge510005000
4Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead376.7420.17572.474
5Labour only for item no.0402200.4532.96594.805
6Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)0.562763.31547.448
7Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used0.56160.689.936
8Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand)4.481984.78891.456
9Add to item no.0605 and 0609 for well staining-For every 3meter up to 15 meter depth.125.971276.42160790.6274
10TRANSPORTATION OF MATERIAL12481224812
11Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing25.6271.21824.144
12Collection of hard metal other then black trap basalt and granite for building work (without blasting) .-40 mm nominal size8.1304.12463.21
13Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.10.876820.8
14Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.5.4103.7559.98
15Transportation of metal 24.3153.193722.517
16Labour only for boulder soling hand packed excluding consolidation.10.897.61054.08
17Labour only for spreading, hand packing, and levelling to gradient and required camber as per MOST 2004 clause 404.3.3 of metal grading-2 & 3 as per MOST 2004 clause 400.2.5 including dressing.8.151.2414.72
18Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.75.421.7117.18
19Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil550.19239.571131809.56849
20Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Dense or hard soil13.5156.592113.965
Total Activity 377000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL0.481000480
240 M.M. METAL8.1132.461072.926
3boldar10.8137.51485
4cement (t)123003600
5Contagecny11449414494
6dewatering510005000
7Masonry Stone130.4565785705.65
8Reinforced Cement Concrete (Ce046.950
9sand (t)13.678610689.6
10sand motor5.4207.51120.5
11TRAINSPORT CHARGE11981219812
12साईनबोर्ड 120002000
Total Material 146000