S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Contingency | 1 | 14494 | 14494 |
3 | Work charge | 5 | 1000 | 5000 |
4 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 376.74 | 20.1 | 7572.474 |
5 | Labour only for item no.0402 | 200.45 | 32.9 | 6594.805 |
6 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 0.56 | 2763.3 | 1547.448 |
7 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 0.56 | 160.6 | 89.936 |
8 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand) | 4.48 | 1984.7 | 8891.456 |
9 | Add to item no.0605 and 0609 for well staining-For every 3meter up to 15 meter depth. | 125.97 | 1276.42 | 160790.6274 |
10 | TRANSPORTATION OF MATERIAL | 1 | 24812 | 24812 |
11 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing | 25.62 | 71.2 | 1824.144 |
12 | Collection of hard metal other then black trap basalt and granite for building work (without blasting) .-40 mm nominal size | 8.1 | 304.1 | 2463.21 |
13 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 10.8 | 76 | 820.8 |
14 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 5.4 | 103.7 | 559.98 |
15 | Transportation of metal | 24.3 | 153.19 | 3722.517 |
16 | Labour only for boulder soling hand packed excluding consolidation. | 10.8 | 97.6 | 1054.08 |
17 | Labour only for spreading, hand packing, and levelling to gradient and required camber as per MOST 2004 clause 404.3.3 of metal grading-2 & 3 as per MOST 2004 clause 400.2.5 including dressing. | 8.1 | 51.2 | 414.72 |
18 | Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7 | 5.4 | 21.7 | 117.18 |
19 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 550.19 | 239.571 | 131809.56849 |
20 | Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Dense or hard soil | 13.5 | 156.59 | 2113.965 |