S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | (a) Dense or hard soil (PT/60/60) | 4.32 | 171.506944444444 | 740.91 |
2 | Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine. | 30 | 3.60033333333333 | 108.01 |
3 | Filling dug pits with manure/compost for dug-pit size 0.60x0.60x0.60 m (using Manure and Excavated earth for filling) | 20 | 12.611 | 252.22 |
4 | Watering, Weeding, Hoeing, Training, Pruning, Mulching, Stacking, Bunding, along sides (thala making), filling the soil in and around the plant spraying insecticide/pesticide, putting required manure and fertilizer etc, full supervision (only in case of survival more than 80%) for first year (for block plantation) | 20 | 180.366 | 3607.32 |
5 | (I) Neebu Plant (layering) | 5 | 24.95 | 124.75 |
6 | (X) Sitafal plant (grafted) | 5 | 48.68 | 243.4 |
7 | (III) Guava Plant (grafted) | 5 | 43.03 | 215.15 |
8 | (VII) Ber plant (Budded) | 5 | 41.9 | 209.5 |
9 | Preparation of Germination bed 10.00mx1.00x0.50m =5cum/bed i/c excavation , picking of boulders, kankar etc breaking clods and filling with fertile soil, sand and FYM | 3 | 318.116666666667 | 954.35 |
10 | Purchasing i/c sowing of seeds per bed (Seeds of Munga) | 1 | 2333.77 | 2333.77 |