State: MADHYA PRADESH District: KHANDWA Block: BALADI Panchayat: LAHADPUR MAL
Work Code: 1725001027/IF/702 (कपिलधारा इसाक बाबुखां)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 1/4/2012 Work start date : 23/4/2012
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 000036 Sanction Date : 23/4/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
123000 82000 0 0 0 0 0 82000 0 205000
Financial Sanction Details
Financial\Administrative Sanction No: 0000002 Financial\Administrative Sanction Date 24/4/2012
Fin. Sanc. Amt. (in Rs) NREGA:205000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
205000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil356.9286.2530784.35
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil268.194211263.98
3Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)0.2465029300.4
4Dag-beling-Single spade stroke minimum 75mm deep000
5Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead140.6318.32573.529
6Labour only for item no.0402000
7Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)6.332557.616189.608
8False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift000
9False work for R.C.C. and P.C.C. work in plinth and foundation127128.616332.2
10Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars17851.79202.6
11Stacking and boxing.-Moorum or sand4.512.656.7
12Transportation of metal 12.22134.11638.702
13Transportation of metal 5.38125.4674.652
14Transportation of metal 1.39112.86156.8754
15Transportation of metal 0.18112.8620.3148
16FOR EARTHEN DAM - Providing fitter blanket, horizontally, including laying, Spreading, packing etc. in layers of required thickness but excluding excavation of foundation.-Metal 80 mm nominal size4.5125.7565.65
17FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders13.52783753
18Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil22.6775.31707.051
19Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil9.967.8671.22
20Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum31.1393.382906.9194
21Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)59.14216.6812814.4552
22Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.202.7412.49683612.9392
23Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring chiselling (where blasting is prohibited)000
24Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work000
25Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed-Hard moorum for Road Work000
26work charge000
Total Activity 205000
S.NoMaterialQuantityUnit PriceTotal
110 M.M. STEEL000
220 M.M. METAL5.59505225
3blasting17610017600
4Cement(bori)4030012000
5Centering and Shuttering101.610010160
6CONTANGANCY195009500
7desal pump rent106506500
8MASON (PERDAY)163004800
9PhotoCopy & Stationary1900900
10Plants1050500
11Sand4.312005160
12STEEL185529620
13Transpotation Charges000
Total Material 82000