S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling foundation, around masonry work, plinth, sides of foundation etc. with moorum I/c ramming layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m. | 52.8 | 272.567424242424 | 14391.56 |
2 | (b) C.C. 1:3:6 (1cement, 3sand, 6metal) | 34.11 | 3421.81735561419 | 116718.19 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15)
(a) C.C. 1:2:4 (1cement, 2sand, 4metal) | 110.34 | 4362.07458763821 | 481311.31 |
4 | (b) CC 1:1.5:3 (1 cement, 1.5 sand, 3 graded stone aggregate 20mm nominal size) | 18.48 | 6138.66991341991 | 113442.62 |
5 | False work for R.C.C. and P.C.C. work in plinth and foundation. | 201.06 | 121.251865114891 | 24378.9 |
6 | (a) Mild steel and Medium tensile steel bars | 1645.28 | 83.8530645239716 | 137961.77 |
7 | b (i) Dense or hard soil for Road Work | 7.07 | 156.080622347949 | 1103.49 |
8 | b (iii) Dense or hard soil for Tank Work | 2.57 | 156.081712062257 | 401.13 |
9 | c (i) Hard moorum for Road Work | 17.66 | 207.775198187995 | 3669.31 |
10 | c (iii) Hard moorum for Tank Work | 6.44 | 207.900621118012 | 1338.88 |
11 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 16.73 | 655.525403466826 | 10966.94 |
12 | a (ii) Disintegrated or soft rock (not requiring blasting) for Well Work | 45.92 | 655.525479094077 | 30101.73 |