S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 0 | 0 | 0 |
2 | Work charge | 1 | 17000 | 17000 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 48.75 | 3057.7 | 149062.875 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 66.16 | 2228.1 | 147411.096 |
5 | False work for R.C.C. and P.C.C. work in plinth and foundation | 165 | 126.6 | 20889 |
6 | Collection of approved soil having CBR not less then 12, including stacking at quarry. | 82.5 | 316.57 | 26117.025 |
7 | Transportation of metal | 1 | 74483.1 | 74483.1 |
8 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 50metres and upto 1.5metre.-Dence or hard soil | 600 | 9.3 | 5580 |
9 | Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia | 150 | 308.2 | 46230 |
10 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 38 | 73.4 | 2789.2 |
11 | SIGN BOARD | 1 | 2000 | 2000 |