S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Ordinary shrub jungle (areas below 25% covered by shrubs) clearance involving removal of grass. Shrubs, bushes and twigs, excluding uprooting (for survey works) | 0 | 0 | 0 |
2 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 464.1 | 76 | 35271.6 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 1088 | 25.45 | 27689.6 |
4 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1:2 (1cement, 1sand, 2graded stone aggregate 20 mm nominal size) | 2822 | 36.65 | 103426.3 |
5 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size) | 64.6 | 3488 | 225324.8 |
6 | False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift | 8490 | 0.497 | 4219.53 |
7 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime Mortar 1: 2(1lime, 2sand) | 1088 | 0.064 | 69.632 |
8 | Add for masonry in supper structure above plinth level up to floor two level | 54.91 | 2628.4 | 144325.444 |
9 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 2605.3 | 52.2 | 135996.66 |
10 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:3 (1cement, 3sand) | 476.19 | 4.2 | 1999.998 |
11 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 250 | 4 | 1000 |