Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 05:26:18 PM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: JAWASA
Work Code: 1702001018/WC/22012034970669 (Dug pond majra madiyan)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2022 Work start date : 13/5/2022
Present status : Non-existent Proposed Status : Constr of Earthen contour Bund for Community
Tech Sanction Details
Technical Sanction No. : 1702001/2022-2023/168567/TS Sanction Date : 22/12/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
1059454.21 347376.06 35019.15 11983.68 0 0 0 395000 0 1453833.1
Financial Sanction Details
Financial\Administrative Sanction No: 1702001/2022-2023/168567/AS Financial\Administrative Sanction Date 23/12/2022
Fin. Sanc. Amt. (in Rs) NREGA:1453833 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1454000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.28007.0239857142857119667.16
2(I) Lead upto 100 Metres514538.88872303207200082.48
3(I) 1.50 m. to 3.00 m.514510.483560738581153937.92
4(c) C.C. 1:4:8 (1cement, 4sand, 8metal)6.33055.025396825419246.66
5(c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size)3.155774.5142857142918189.72
6(e) In Cement mortar 1:6 (1cement, 6sand)28.352972.2705467372184263.87
7(XXX) 60 Km. Lead771042.3806493506580263.31
8Benching the seat of embankment to an average depth of 15cm and cross slope of 1 in 12 including cleaning of all foreign material, vegetation and other growth like grass and plant roots and removing the rubbish up to a suitable distance and dressing etc. complete.367.5172.89001360544263537.08
9Site clearance, cutting grass, raking into heaps and removing off the premises56002.818912515785.91
10b (iii) Dense or hard soil for Tank Work5145144.075000971817741265.88
11(b) Dense or hard soil25.2156.7873015873023951.04
1222cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum350430.3944150638.04
Total Activity 1451000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper1.682110001682.1
20084-Hire charges of Diesel truck - 9 tonne (without POL)12.41541237210026072.365977
30297-Stone Aggregate(single size): 10 mm nominal size0.693630436.59
40367-Portland Cement4.7141325640030170.448
50982-Coarse sand (zone III)4.2268275979.24138.909488
60983-Fine sand (zone IV)11.427885102511713.582125
71157-Stone for masonry work32.88649516278.57
81158-Stone for pitching 15 cm x 22.5 cm10545047250
91235-Diesel oil338.045286110033804.52861
103-Display Board / CIB130003000
115001-Mobil oil12.104164372703268.1243799
12MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT5.84561255253068.9465625
13MR6007-Hier Charges for Centering3.158002520
14MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)4.268887903372.4152
Total Material 187000