S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 3614 | 3614 |
2 | Contingency | 1 | 1139840 | 1139840 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 162.8 | 148.33 | 24148.124 |
4 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 114 | 152.26 | 17357.64 |
5 | Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing. | 442.63 | 3823.54 | 1692413.5102 |
6 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size) | 140.48 | 5131.84 | 720920.8832 |
7 | False work for R.C.C. and P.C.C. work in plinth and foundation | 45 | 172.09 | 7744.05 |
8 | Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide) | 228.79 | 632.76 | 144769.1604 |
9 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 827.05 | 69.25 | 57273.2125 |
10 | Centering and shuttering for arch roof including all lead and lift. (for low cost House) | 371.5 | 163.98 | 60918.57 |