S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 0 | 1500 | 0 |
2 | Cutting down trees (exceeding 30cm girth, grubbing uproot, filling pits and levelling off ground, lopping branches, trimming, removing not exceeding 50meter & staking serviceable material and cleaning site.-Girth exceeding 30 cm and not exceeding 100 cm | 57.53 | 715.3 | 41151.209 |
3 | Uprooting of roots of trees including removing and stacking (Girth to be measured at 1.00 m above G.L.) | 1 | 1310.05 | 1310.05 |
4 | Lime Surkhi Mortar 1:1:1 ( 1 lime putty, 1 surkhi, 1sand ) | 27.58 | 1740.8 | 48011.264 |
5 | Excavating post holes (or similar holes) upto 0.5cum including getting out the excavated soil, than returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc., disposing of-Disintegrated or soft rock (not requiring blasting) | 506 | 132.2 | 66893.2 |
6 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 8.25 | 3007.5 | 24811.875 |
7 | Labour only for item no. 0413 (for any proportion of cement concrete) | 8.25 | 402.1 | 3317.325 |
8 | False work for R.C.C. and P.C.C. work in plinth and foundation | 25.12 | 126.2 | 3170.144 |
9 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime Mortar 1: 2(1lime, 2sand) | 2.95 | 2074.6 | 6120.07 |
10 | Honey comb brick masonry with class 25 open bhatta or pajawa burnt brick 10cm Thick.-In cement mortar 1:3 | 3.799 | 182.4 | 692.9376 |
11 | Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee. | 337.99 | 48.2 | 16291.118 |
12 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:3 (1cement, 3sand) | 44.44 | 111.2 | 4941.728 |
13 | Transportation of metal | 655 | 114.1 | 74735.5 |
14 | Transportation rates for 75 to 99 mm dia ballies. | 2556.12 | 8.2 | 20960.184 |
15 | 1902 Transportion of metal | 284.44 | 208.4 | 59277.296 |