Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 06:37:18 PM 
Back  
State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: GADHOLAKHANDE
Work Code: 1711003048/WC/9993656427 (ग्रेबियन स्‍टेक्‍चर निर्माण कार्य चकरा नाला पर)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2015 Work start date : 29/7/2015
Present status : Non-existent Proposed Status : Gabions
Tech Sanction Details
Technical Sanction No. : 31/Ga Sanction Date : 15/7/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
457000 173000 0 0 0 0 0 173000 0 630000
Financial Sanction Details
Financial\Administrative Sanction No: 15/Ga Financial\Administrative Sanction Date 16/7/2015
Fin. Sanc. Amt. (in Rs) NREGA:630000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
630000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Contingency11789617896
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil103.95656756.75
3Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee.944.558.154875.45
4TRANSPORTATION OF MATERIAL480234.37112497.6
5Collection of rubble masonry (size 0.014cum to 0.06cum) other then black trap, basalt or granite.480467.7224496
6FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc.173.25262.545478.125
7FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders480347166560
8Site clearance, cutting grass, raking into heaps and removing off the premises9001.61440
Total Activity 630000
S.NoMaterialQuantityUnit PriceTotal
1Binding wire944.558.154875.45
2Bolder480234.37112497.6
3contangency146264626
4PhotoCopy & Stationary1500500
5Photograph1500500
Total Material 173000