S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 3700 | 7.60931621621622 | 28154.47 |
2 | (III) Lead upto 200 meters | 976.8 | 126.36338042588 | 123431.75 |
3 | Filling foundation, around masonry work, plinth, sides of foundation etc. with moorum I/c ramming layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m. | 244.2 | 272.567403767404 | 66560.96 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15)
(a) C.C. 1:2:4 (1cement, 2sand, 4metal) | 28.86 | 4408.24566874567 | 127221.97 |
5 | (c) Masonry stones, pitching stones or boulders | 976.8 | 50.5703214578215 | 49397.09 |
6 | (XXXI) 70 Km. Lead | 24.531 | 845.800823447882 | 20748.34 |
7 | (VI) 3.0 Km. Lead | 976.8 | 151.317557330057 | 147806.99 |
8 | (XI) 6 Km. Lead | 6.349 | 187.577571271066 | 1190.93 |
9 | (XXX) 60 Km. Lead | 12.41 | 682.011281224819 | 8463.76 |
10 | Labour only for boulder soling hand packed excluding consolidation. | 976.8 | 215.827723177723 | 210820.52 |
11 | (b) Dense or hard soil | 288.6 | 169.853083853084 | 49019.6 |
12 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 976.8 | 187.297502047502 | 182952.2 |