S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 14.17 | 882 | 12497.94 |
2 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 7.08 | 3307.4 | 23416.392 |
3 | False work for R.C.C. and P.C.C. work in plinth and foundation | 14 | 147.8 | 2069.2 |
4 | Coursed rubble masonry second sort in plinth and foundation.-In Cement mortar 1:8 (1cement, 8sand) | 37.8 | 2082.1 | 78703.38 |
5 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Ruled pointing | 84 | 127.6 | 10718.4 |
6 | Transportation of sand | 16.49 | 377.7 | 6228.273 |
7 | Transportation rates for Masonry stone. | 37.8 | 257.18 | 9721.404 |
8 | Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock. | 4.66 | 177.9 | 829.014 |
9 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 3.165 | 291.3 | 921.9645 |
10 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 75.6 | 52.7 | 3984.12 |
11 | contingency | 1 | 7309.9125 | 7309.9125 |