Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 06:36:32 AM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: GADHOTA(P)
Work Code: 1703004021/RC/22012034219444 (KHARANJA NIRMAN MAIN ROAD SE BHJAN SINGH KE GHA)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2014 Work start date : 30/5/2014
Present status : Earthern road Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 21/3100 Sanction Date : 20/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
312026 122772 0 0 0 0 0 123000 0 434798
Financial Sanction Details
Financial\Administrative Sanction No: 21/008 Financial\Administrative Sanction Date 20/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:434798 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
435000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Contingency114702.914702.9
2Dag-beling-Single spade stroke minimum 75mm deep6000.2120
3Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.1080215.7232956
4Stacking without boxing.-Puddle earth, moorum, sand or kankar310.510.53260.25
5Transportation rates for Masonry stone.162385.5662460.72
6Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.310.5172.2653486.73
7Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.2704111070
8Collection of hard moorum including stacking at quarry.310.5130.840613.4
9Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.126012.816128
Total Activity 435000
S.NoMaterialQuantityUnit PriceTotal
1contangency and work charges16824.556824.55
2खण्‍डा परिवहन162385.5662460.72
3मुरम परिवहन (1)310.5172.2653486.73
Total Material 123000