Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:34:48 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: BALADI Panchayat: SEMRUDH RAIYAT
Work Code: 1725001035/RC/22012034341826 (SUDUR SAMPARK NARENDRA KE KHET SE MINAWA KI AUR)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 17/4/2017 Work start date : 10/6/2017
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 572/00 Sanction Date : 1/6/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
373000 428000 0 0 0 0 0 428000 0 801000
Financial Sanction Details
Financial\Administrative Sanction No: 26/00 Financial\Administrative Sanction Date 2/6/2017
Fin. Sanc. Amt. (in Rs) NREGA:801000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
801000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises100011000
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.412.5404.25166753.125
3Mud Mortar12.5231.62895
4Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Hard rock requiring chiselling (i.e. hard rock requiring blasting but where blasting is prohibited)42.3373.615803.28
5Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead1000.2256.32256371.264
6Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)10.5317.83336.9
7Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)41.52878.2119445.3
8Chain and compass survey.-Canals/Roads12.5584.37303.75
9Fly levelling for fixing temporary bench marks.-Upto 15 m interval151954.7829321.7
10Double levelling for transfer of bench marks.-Above 15 m interval5.581590.468874.7668
11Collection of quarried stone or rubble.-Size 0.014 cum to 0.0619.251772.934128.325
12Stacking without boxing.-Puddle earth, moorum, sand or kankar158.36198.2531394.87
13Transportation rates for Masonry stone.1197.6511.513772.975
14Labour only for spreading, hand packing, and levelling to gradient and required camber as per MOST 2004 clause 404.3.3 of metal, grade-1 As per MOST 2004 clause 400.2.5 including dressing.321.579.425527.1
15Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7125.54112.714148.358
16Rolling and consolidating water bound mecadam coat with any size of metal of any thickness upto 100mm thickness(including rolling screening or binding materials) including watering & filling in depressions which occur during the process with power roller-Excluding hire and running expenses of roller41.9578.43288.88
17Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1000 mm dia.21.23185.5467533.448
Total Activity 801000
S.NoMaterialQuantityUnit PriceTotal
140 mm Metal5.3600.23181.06
2Cement10031031000
3Centering and Shuttering15450.26753
4Hard Moorum Transportation376650.36244535.36
5HumePipes5.963185.2518984.09
6mixer Mashin10350.23502
7Transportation Of Material7200014000
8गिटी 20 mm63.25245.6915539.8925
9पानी टेंकर3580028000
10रेत15200030000
11रोलर90350.731563
Total Material 428000