State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: RITHODAN(P)
Work Code: 1703004071/DP/489 (shanti dham rithodan)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 28/9/2011 Work start date : 22/1/2012
Present status : Not Exist Proposed Status : Plantation
Tech Sanction Details
Technical Sanction No. : TS 268 Sanction Date : 28/9/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
374632 368368 0 0 0 0 0 369000 0 743000
Financial Sanction Details
Financial\Administrative Sanction No: TS 06 Financial\Administrative Sanction Date 10/10/2011
Fin. Sanc. Amt. (in Rs) NREGA:743000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
743000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.3303.41122
2Contingency123009.2423009.24
3Dag-beling-Single spade stroke minimum 75mm deep6000.2120
4Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.30.51809.924710.049
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)1.581743.22754.256
6Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)2.231514.43377.112
7Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing.243142.934724.7
8False work for R.C.C. and P.C.C. work in plinth and foundation10.56116.41229.184
9Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.281.61784.7220979.367
10Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand)10.541278.313473.282
11Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height638.457.336580.32
12Pointing on CR masonry with cement mortar 1:4(1cement, 4sand)-Raised and cut pointing98648.647919.6
13Providing corrugated C.I. sheet of class III roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with complete excluding the cost of purlins, rafters and trusses.-0.80 mm thick sheet.19.2621.711936.64
14Second class brick flooring laid dry grouted with C.M. 1:6 i/c finishing the joints flush.14.08226.53189.12
15Transportation of 20 MM metal10.26345.93548.934
16Transportation of sand24.3162.813956.283
17Transportation rates for Masonry stone.294.04310.191181.804
18Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.35.27198.36994.041
19Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.137.31147.1520205.1665
20Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN14.430432
21Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil322.9473.823832.972
22Collection of hard moorum including stacking at quarry.40.74109.34452.882
23TRANSPOTATION OF CEMENT4.65147.15684.2475
24All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala construction, earthing up etc.e with securty for first year per 675 plants.35112242822
25All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala preparation, earthing up etc. with securty for second year per 675 plants.32412239528
26All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala preparation, earthing up etc. with securty for thirdyear per 900 plants.32412239528
27Supply of farm yard mannure (FYM) to the plantation site.9010900
28Supply of vermi compost1176702
29Supply of singal super phosphate (SSP)1176.6772.2
30Supply of muriate of potash (MOP)11717.82082.6
31Supply of urea.1176702
32Supply of Neem cake2720540
33Supply of graphted foresty or horticulture Plant 1.5 to 2 feet plant height117202340
34Supply of Plant protection pesticides per plant, a-foresty plant, b- fruit plant.117101170
35Rent for water Tankar of capacity 5000 Litre including tractor, diesel, driver etc. complete for one day.4570031500
Total Activity 743000
S.NoMaterialQuantityUnit PriceTotal
1AC SHEET 1019.2621.711936.64
2Boulder Transportation294.04310.191181.804
3Bricks8003.52800
4cement 314526838860
5Contangency137909.1837909.18
6IRON GATE 2638.464.741304.48
7METAL10.261245.912782.934
8photocopy20051000
9Sand24.3762.8118536.283
10Seedlings / Graft cost117202340
11transportation(good soil)186.66198.337014.678
12Transpotation Charges9080072000
13Varmi Compost1176702
Total Material 369000