S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 0 | 1500 | 0 |
2 | Survey & Investigation | 0 | 2000 | 0 |
3 | Work charge | 1 | 33000 | 33000 |
4 | Transportation of metal | 2600 | 114.1 | 296660 |
5 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 50metres and upto 1.5metre.-Loose or soft soil | 9200 | 8 | 73600 |
6 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 9200 | 21.5 | 197800 |
7 | Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor | 9200 | 23 | 211600 |
8 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 9200 | 60.2 | 553840 |
9 | 1902 Transportion of metal | 600 | 208.4 | 125040 |