S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 0 | 3000 | 0 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 2100 | 1.6 | 3360 |
3 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Hard moorum | 261 | 92.6 | 24168.6 |
4 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 1000 | 21.9 | 21900 |
5 | Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil | 1070.5 | 5.9 | 6315.95 |
6 | Extra for every additional lift of 1.5 m or part there of-Disintegrated/ soft or hard rock | 856.4 | 10.3 | 8820.92 |
7 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 3 | 3089.9 | 9269.7 |
8 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 5 | 2404.1 | 12020.5 |
9 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 3 | 169.4 | 508.2 |
10 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand) | 31 | 2005 | 62155 |
11 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Raised and cut pointing | 25 | 133.3 | 3332.5 |
12 | Labour only for item no.1272 | 437.5 | 118.6 | 51887.5 |
13 | Add extra item no. 1274 for quarried boulder pitching. | 437.5 | 107.3 | 46943.75 |
14 | Collection of puddle earth including stacking at quarry | 363 | 90.2 | 32742.6 |
15 | Transportation of sand | 105 | 138.42 | 14534.1 |
16 | Transportation rates for Masonry stone. | 30 | 285.32 | 8559.6 |
17 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 100 | 176.87 | 17687 |
18 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 105 | 41 | 4305 |
19 | FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc. | 363 | 262.5 | 95287.5 |
20 | FOR EARTHEN DAM - Puddle filling of good clay (excluding cost of puddle earth and water) including mixing kneeding by tamping, ramming and laying etc. | 363 | 151.9 | 55139.7 |
21 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work | 4500 | 81.2 | 365400 |
22 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Hard moorum | 187.5 | 108.1 | 20268.75 |
23 | Collection of hard moorum including stacking at quarry. | 105 | 130.8 | 13734 |