State: MADHYA PRADESH District: DHAR Block: NALCHHA Panchayat: Aamkho
Work Code: 1722005/WC/22012034525987 (निस्‍तार तालाब जरखडी नाला आमखो )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2019-2020 Execution Level : BP
Execution Agency : Rural Engineering Services(04004) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/10/2019 Work start date : 24/1/2020
Present status : Non-existent Proposed Status : Constr of Earthen Check Dam for Community
Tech Sanction Details
Technical Sanction No. : 483/158 Sanction Date : 26/12/2019
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
3395000 2263000 0 0 0 0 0 2263000 0 5658000
Financial Sanction Details
Financial\Administrative Sanction No: 158/483 Financial\Administrative Sanction Date 24/1/2020
Fin. Sanc. Amt. (in Rs) NREGA:5658000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
5658000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
122cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth.1118.12195.1218145.212
2Transportation of metal 1462.64139.93204667.2152
3Transportation of metal 299.44139.9341900.6392
4Transportation of metal 11320.79139.931584118.1447
5Transportation of metal 2459.5789.78220820.1946
6FOR EARTHEN DAM - Benching the seat of embankment over to an average depth of 15cm and cross slope of 1:12 including earth work removing the rubbish upto a distance of 50m including dressing.229.91149.1634293.3756
7FOR EARTHEN DAM - Puddle filling of good clay (excluding cost of puddle earth and water) including mixing kneeding by tamping, ramming and laying etc.604.4390.72236151.168
8FOR EARTHEN DAM - Providing fitter blanket, horizontally, including laying, Spreading, packing etc. in layers of required thickness but excluding excavation of foundation.-Metal 80 mm nominal size208.17327.2868129.8776
9FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders308.89541.79167353.5131
10Site clearance, cutting grass, raking into heaps and removing off the premises3297.82.438013.654
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Loose or soft soil for Tank Work589.599.0858407.66
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed- Dense or hard soil for Tank Work3032.59124.3376950.937
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Tank Work6319.79165.571046367.6303
14Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Tank Work1520.12527.65802091.318
15Collection of puddle earth including stacking at quarry604.4167.85101448.54
16Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.299.44941281773.04
17FTSC- Field supervision charges1207000207000
Total Activity 5658000
S.NoMaterialQuantityUnit PriceTotal
1Boulder Transportation697.3384.29267965.417
2Contangancy11500015000
3pitching stone lead 20 km1250200.16250200
4Sand0139.930
5sign board159995999
6Transportanion of Cashing soil1334081.311084675.4
7Transportanion of hard Muram0139.930
8Transportanion of harting soil 580094.58548564
9Transportanion of Puddle earth890100.8989792.1
10Transportanion of soft soil 089.780
11Water Cane026.160
Total Material 2263000