State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: PATAI
Work Code: 1713004007/RC/22012034219876 (खेत सडक ललित पाण्‍डेय के घर से आगे की ओर Ts 01 )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2014-2015 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2014 Work start date : 15/5/2014
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 01/007/01 Sanction Date : 23/5/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
633000 440000 0 0 0 0 0 440000 0 1073000
Financial Sanction Details
Financial\Administrative Sanction No: 15/007/ Financial\Administrative Sanction Date 24/5/2014
Fin. Sanc. Amt. (in Rs) NREGA:1073000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1073000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard015000
2Site clearance, cutting grass, raking into heaps and removing off the premises57601.69216
3Work charge13477134771
4Dag-beling-Single spade stroke minimum 75mm deep27000.2540
5Transportation of metal 2059.1102.69211448.979
6Transportation of metal 195409540
7Transportation of metal 250.29223.4755932.3063
8Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia15964.414466
9Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making1654.69521.535575.9425
10Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor1645.432337844.89
11Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:139.05578.380412.615
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.1241.02181.2100770.9052
13Collection of puddle earth including stacking at quarry2059.86112.8232352.208
14Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 With Reinforced cement concrete (i) 5th Kilometre Stone (precast) (ii) Ordinary Kilometer Stone (Precast) (iii) 200 m stone (precast)808.38130.8105736.104
151902 Transportion of metal166.3114.319008.09
16R C C Pole Fixing only40580.532602.5
17Barbed wire Fixing only417.1561.525654.725
18Labour difference in case of old SoR16625166251
Total Activity 1073000
S.NoMaterialQuantityUnit PriceTotal
1collection of moorum 010
2Compaction58014483520
3Compaction of Earth Work3016.722.567875.75
4contigency13477134771
5km stone1.13374958491.835
6pipe15905.913588.5
7Transportation charges1150577150577
8Transportation Of Selected Soi1282.9463.2781171.6138
Total Material 440000