Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 24-Jun-2024 06:50:31 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: BADGAON PIPLOD
Work Code: 1725007005/WC/22012034867514 (जलसंवर्धन निर्मान कार्य रेह्मान अब्दुल के खेत के पास केदारखेदी)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2021 Work start date : 9/11/2021
Present status : Non-existent Proposed Status : Constr of Earthen Check Dam for Community
Tech Sanction Details
Technical Sanction No. : 1725007/2021-2022/582851/TS Sanction Date : 4/2/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
366552.95 119566.14 88.69 298.68 0 0 0 120000 0 486506.46
Financial Sanction Details
Financial\Administrative Sanction No: 1725007/2021-2022/582851/AS Financial\Administrative Sanction Date 8/2/2022
Fin. Sanc. Amt. (in Rs) NREGA:486795 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
487000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1(I) 0.5 Km. Lead743.75139.874554621849104031.7
2Site clearance, cutting grass, raking into heaps and removing off the premises45002.6669133333333312001.11
3a (iii) Loose or soft soil for Tank Work2000100.97567201951.34
4c (iii) Hard moorum for Tank Work875181.55992158864.93
5Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine.17503.600182857142866300.32
6Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works )13644.013644.01
Total Activity 487000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.01787688515.82026
20084-Hire charges of Diesel truck - 9 tonne (without POL)27.76666667224262252.86667414
30367-Portland Cement0.07775125511428.4868632
40368-White cement 0.0003806157445.9921664
50983-Fine sand (zone IV)0.21554641076.25231.981813
61235-Diesel oil74.97685097.96
75001-Mobil oil2.77666667182.9507.852333943
87900-Modular common burnt clay bricks of class designation 7.5244.44.131009.372
9MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT0.06552534.125
10MR6032-Snowcem/ durocem0.00072662778920.1914874
11MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.02468216.368
12MR6089-Hire Charges for tractor with ploughing arrangement including running expanses and driver7.8757085575.5
Total Material 75200