S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 0 | 0 | 0 |
2 | Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil | 862.31 | 10.7 | 9226.717 |
3 | Extra for every additional lift of 1.5 m or part there of-Disintegrated/ soft or hard rock | 2012.06 | 21.4 | 43058.084 |
4 | Transportation of metal | 2874.37 | 92.16 | 264901.9392 |
5 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 2874.37 | 16.9 | 48576.853 |
6 | Lossening of hard soil by ploughing the existing gound | 2874.37 | 2.7 | 7760.799 |
7 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 2874.37 | 50 | 143718.5 |
8 | Field Technical Supervisior Charge-FTSC | 1 | 5172 | 5172 |