S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Ordinary shrub jungle (areas below 25% covered by shrubs) clearance involving removal of grass. Shrubs, bushes and twigs, excluding uprooting (for survey works) | 400 | 0.96615 | 386.46 |
2 | (a) Dense or hard soil (PT/60/60) | 86.4 | 159.736805555556 | 13801.26 |
3 | Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works ) | 1 | 3578.36 | 3578.36 |
4 | Filling dug pits with manure/compost for dug-pit size 0.60x0.60x0.60 m (using Manure and Excavated earth for filling) | 400 | 11.978 | 4791.2 |
5 | (I) Pit Size : 0.60 x 0.60 x 0.60 m, height less than 1.5 feet | 560 | 15.594 | 8732.64 |
6 | Watering, Weeding, Hoeing, Training, Pruning, Mulching, Stacking, Bunding, along sides (thala making), filling the soil in and around the plant spraying insecticide/pesticide, putting required manure and fertilizer etc, full supervision (only in case of survival more than 80%) for second year (for block plantation) | 1200 | 172.309175 | 206771.01 |
7 | Watering, Weeding, Hoeing, Training, Pruning, Mulching, Stacking, Bunding, along sides (thala making), filling the soil in and around the plant spraying insecticide/pesticide, putting required manure and fertilizer etc, full supervision (only in case of survival more than 80%) for 3rd Year/4th Year/5th Year (for block plantation) | 800 | 172.309175 | 137847.34 |
8 | Providing earthen pot , to be laid in the soil after planting.(labour component included in the activity of watering) | 160 | 50 | 8000 |
9 | (VIII) 81 to 100 km | 550 | 3.26 | 1793 |
10 | Providing Bucket/Can for carrying water for watering plants for community plantation | 5 | 750 | 3750 |
11 | Maintenance of the bicycle of paudhrakshak | 5 | 500 | 2500 |
12 | Supervision Charges for GP in Community Plantation and खेत की मेड पर वृक्षारोपण (individual plantation) Per Year | 5 | 2000 | 10000 |
13 | Supervision Charges for Paudhrakshak for Road side/Canal side/ Community block/ Community compound Plantation Per Year(पर्यवेक्षण शुल्क पौधरक्षक, प्रतिवर्ष हेतु : सड़क किनारे/ नहर किनारे / सामुदायिक/ सार्वजनिक परिसर हेतु वृक्षारोपण ) | 5 | 2000 | 10000 |
14 | Providing and fixing bamboo tree guard with 12 rows of horizontal split bamboo tightened to bamboo poles 2m long, 1.7m above and 0.3m below ground level, 4 numbers in each tree guard. Average dia of bamboo pole shall be 8cm to 12cm. The spit bamboo used shall be 80cm in length having average dia 25mm and c/c spacing of split bamboo will be 13cm. | 60 | 355.285333333333 | 21317.12 |