S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 1.8 | 1414.64 | 2546.352 |
2 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 12 mm graded metal is used | 0.4 | 3947.45 | 1578.98 |
3 | False work for R.C.C. and P.C.C. work in plinth and foundation | 1.65 | 166.08 | 274.032 |
4 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 5.69 | 1239.83 | 7054.6327 |
5 | Pointing on CR masonry with cement mortar 1:4(1cement, 4sand)-Raised and cut pointing | 21.6 | 109.18 | 2358.288 |
6 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 1 | 4064 | 4064 |
7 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 3.24 | 156.8 | 508.032 |
8 | SIGN BOARD | 1 | 1000 | 1000 |
9 | contingency | 1 | 1615.68 | 1615.68 |