State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: DEWAS
Work Code: 1713004012/FP/22012034636386 (आर सी सी नाली निर्माण रमेश पटेल के घर से जानकी पटेल के घर तरफ)
Work Category: Other Works
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2023 Work start date : 2/10/2023
Present status : Derelict Proposed Status : Constr of Diversion Storm Water Drain for Comm
Tech Sanction Details
Technical Sanction No. : 12/679 Sanction Date : 23/9/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost 15th Finance Commission scheme2 scheme3 Total
51000 0 0 0 352000 0 0 352000 0 403000
Financial Sanction Details
Financial\Administrative Sanction No: 05/12/23 Financial\Administrative Sanction Date 24/9/2023
Fin. Sanc. Amt. (in Rs) NREGA:51000 15th Finance Commission
352000
Scheme 2
0
Scheme 3
0
Total
403000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard130003000
2Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil88169.8514946.8
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)36.14408.25159137.825
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)113467.9938147.89
5False work for R.C.C. and P.C.C. work in plinth and foundation310191.259272
6Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars1416.9390.38128062.1334
Total Activity 403000
S.NoMaterialQuantityUnit PriceTotal
1Convergence Amount1352000352000