State: MADHYA PRADESH District: KHARGONE Block: BHAGVANPURA Panchayat: DHARMPURI
Work Code: 1724008022/RC/22012034550291 (sudhur sadk pujara faliya se fate tak)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2020 Work start date : 26/11/2020
Present status : Gravel Road Proposed Status : Repair & maint of Gravel Road Roads for Comm
Tech Sanction Details
Technical Sanction No. : 1724008/2020-2021/424915/TS Sanction Date : 25/11/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
857201.31 634778.36 1171.35 4349.89 0 0 0 641000 0 1497500.91
Financial Sanction Details
Financial\Administrative Sanction No: 1724008/2020-2021/424915/AS Financial\Administrative Sanction Date 25/11/2020
Fin. Sanc. Amt. (in Rs) NREGA:1497789 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1498000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.50006.54194832709.74
2(a) Puddle earth, sand or kankar190016.896889473684232104.09
3(XV) 10 Km. Lead2500209.742188524355.47
4(b) 1000 mm dia.243762.667590304.02
5Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making 4% camber and required Grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 97% as per table 300.1 and 300.2 of (MORD) - i/c required leads and lifts of materials etc. complete.94517.350105820105816395.85
6Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7). Complet compaction work as per specifications for rural roads (MORD) clause 303, i/c required leads and lifts of materials etc. complete.250019.12251647806.29
7Setting out work (Reference pillars, referencing bench mark and temporary bench mark):- Construction of Reference Bench Mark 50x50x70 cm. made of 1:3:6 cement concrete i/c excavation of 50x50x50 cm pit, working benchmark 30x30x45 cm at every 500 m interval made of 1:3:6 cement concrete i/c excavation of 30x30x30 cm pit and providing and fixing of Reference pillars made of cast in situ or pre cast RCC pole,1.50m long having dimensions as100x100mm at top and 150x150mm at bottom with 4 no. 8mm dia. bars in longitudinal direction and 6mm dia. stirrups at 300mm c/c spacing - made in cement concrete M-15, or finished stone posts 1500 x200x75 mm size embedded in 30x30x45 cm cement concrete 1:3:6 i/c excavation and casting etc. complete, @ 100 m interval or as required on both sides of the formation width preferably at 5.50 m distance from centre line.16828.826828.82
8Survey and investigation and preparation of DPR for road work with chain and compass, auto level, theodolite or total station i/c fixing of permanent benchmark and also fixing of bench mark on all the permanent structures, along the alignment, like boundary wall,electrical poles etc. Also marking of locations of boundary wall,electric poles, telephone poles trees etc. in the road boundary, collection and submission of existing inventory of the road all along the alignment conducting survey@20 metre interval for L-section and for single lane X-section interval will be @ 0.75, 1.25, 1.875, 2.60, 3.75, 4.50, 5.50 and 6.50 metre on both side of centre line for two lane four lane interval for x-section shall be as specified in MORT&H/MoRD Specifications. (FOR LABOUR ONLY IN SURVEYING )1692.12692.12
9(A) With Reinforced cement concrete (ii) Ordinary Kilometer Stone (Pre cast)21607.463214.92
10(A) With Reinforced cement concrete (iii) 200 m stone (precast)4488.29751953.19
11c (i) Hard moorum for Road Work1900178.6304339397.76
12Collection/Excavation of Graval Material meeting the requirements of Hard Moorum as detailed in RES SOR chaper 03 Notes Clause 3.2© including stacking and all leads and lifts up to loading point at quarry.600208.259124955.4
13Collection of River Borne Material (RBM) (any mixture of sand and graval ) i/c boxing and all leads and lifts up to loading point at quarry.600182.495109497
14Stacking of Gravel or Hard Moorum at site without Boxing.60021.727633333333313036.58
15Spreading of material, mixing by mix in place method by manual means or by Tractor mount disk herrows to meet the requirements of Grading and Plasticity given in clause 2.2.2.2, 2.2.2.3, 2.2.3.1 and 2.2.3.2 of IRC:SP:77-2008. and grading by tractor mount grader to get the required profile.600129.85681666666777914.09
16Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine.9453.600179894179893402.17
17Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed.94573.668941798941869617.15
18Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works )13603.483603.48
Total Activity 1498000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.163885144.255
20038-Tractor with ripper attachment4.9177212410445.1948
30055-Smooth Wheeled Roller 8 to 10 tonne47.562523611224.75
40057-Water Tanker 5 to 6 KL Capacity68.91188130.2
50297-Stone Aggregate(single size): 10 mm nominal size0.080363050.589
60367-Portland Cement0.589855113250.3878
70368-White cement 0.0004157446.2976
80763-Glue 3.967.9531.482
90830-Enamel paint1.9239160.13308.074107
100983-Fine sand (zone IV)0.96751076.251041.271875
111005-Twisted steel/deformed bars0.1295428700.212
127335-Binding wire0.122955.586.830782
137900-Modular common burnt clay bricks of class designation 7.5244.44.131009.372
14MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT0.9646525506.415
15MR6032-Snowcem/ durocem0.00072778919.4523
16MR6039-Water4134000.0520670
17MR6045-RCC NP-3 pipe 1000mm(based on LUN rate)242977.7871466.72
18MR6046-RCC NP-3 collar 1000mm(based on LUN rate)7.2266.671920.024
19MR6072-RCC fencing post of CC M20 , 1.85 Mtre long (125MMx125MM bottom & 85MMx85MM top ) (125MM bottom & 85MMx85MM top )20137.382747.6
20MR6073-Lime (Katni)0.04688.827.552
21MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.3766682256.8412
22MR6089-Hire Charges for tractor with ploughing arrangement including running expanses and driver4.25257083010.77
23MR6091-WOOD-Kail wood 2nd class0.003115825.649.05936
Total Material 138000