State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: SAKRAYA
Work Code: 1702001037/RC/22012034287740 (Gravel road sahib ka pura to Baghelen ka pura)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 3/10/2015 Work start date : 29/10/2015
Present status : Gravel Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 114 n Sanction Date : 26/10/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
637000 285000 0 0 0 0 0 285000 0 922000
Financial Sanction Details
Financial\Administrative Sanction No: 03/114 n Financial\Administrative Sanction Date 26/10/2015
Fin. Sanc. Amt. (in Rs) NREGA:922000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
922000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.64804.428512
3Chain and compass survey.-Canals/Roads0.72636457.92
4Fly levelling for fixing temporary bench marks.-Above 15 m interval0.72477343.44
5Levelling - Headwork.-Below 5 m interval0.7215901144.8
6Levelling - Headwork.-Above 15 m interval0.72508.8366.336
7Stacking and boxing.-Moorum or sand43211.54968
8Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1240000240000
9Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN4327130672
10Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making172431.253788.8
11Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor215132.770337.7
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work395288.4349356.8
13Collection of hard moorum including stacking at quarry.432142.561560
14R C C Pole Fixing only43287.737886.4
15contingency13967039670
Total Activity 922000
S.NoMaterialQuantityUnit PriceTotal
1Board130003000
2Compaction of Earth Work172431.253788.8
3Compaction of GSB4327130672
4Compaction of Selected soil215132.770337.7
5contigency13967039670
6Kilometre Stone (200 M)2334668
7Kilometre Stone (ordinary)46872748
8Transportation charges18400084000
Total Material 285000