Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 12:11:15 AM 
Back  
State: MADHYA PRADESH District: KATNI Block: DHIMERKHEDA Panchayat: ATRIYA
Work Code: 1744006066/IF/428 (अतरिया - (कपिलधारा कूप निर्माण कार्य जयराम / रनमत )
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 31/12/2011 Work start date : 28/2/2012
Present status : Existing Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 1398 Sanction Date : 31/1/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
106000 114000 0 0 0 0 0 114000 0 220000
Financial Sanction Details
Financial\Administrative Sanction No: 48/66 Financial\Administrative Sanction Date 31/1/2012
Fin. Sanc. Amt. (in Rs) NREGA:220000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
220000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil11.754.3635.31
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard moorum15.1721087.2
3Filling foundation and around masonry work with moorum I/c ramming layers and watering.1.52121.5184.68
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)0.462621.91206.074
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)1.742818.64904.364
6False work for R.C.C. and P.C.C. work in plinth and foundation7.71120.2926.742
7Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)51.462265116556.9
8Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars76.848.43717.12
915mm thick cement plaster on rough side of wall in-Cement mortar 1:6 (1cement, 6sand)26.9879.72150.306
1020mm thick cement plaster in two coat on rough side of wall in-Cement mortar 1:6 (1cement, 6sand)9.42126.31189.746
11Collection of hard metal other then black trap basalt and granite for building work (without blasting) .-40 mm nominal size9276.52488.5
12Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.969.1621.9
13Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.8.194.2763.02
14Transportation of metal 11900019000
15Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil55.9975.34216.047
16Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum12.1145.81764.18
17Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)9.48317.93013.692
18Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring chiselling (where blasting is prohibited)9.12559.95106.288
19Add in item No. 2401 for lift. (In well excavation)-For every 0.50 m after 1.5 m initial depth upto 6.0 m102.7999.310207.047
20Add in item No. 2401 for lift. (In well excavation)-For every 0.50 m after 6.0 m initial depth upto 10.5 m53.23167.68921.348
21Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 6.0 m initial depth upto 10.5 m27.45339.59319.275
22Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 10.5 m initial depth upto 18.0 m9.12573.75232.144
23Labour difference in case of old SoR11617216172
Total Activity 220000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL.1.4812001776
240 M.M. METAL9.39649.146095.4246
3Bricks257303.0578476.5
4Cement(bori)6623015180
5Sand19.860011880
Total Material 114000