Work Code: 1744006059/RC/22012034199329 (C.C.ROAD AND NIRMAN RAMLAL KE GHAR SE SHIVKA YADAV)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/8/2013 Work start date : 16/1/2014
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 12015/59 Sanction Date : 26/12/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
34000 22000 0 0 84000 0 0 106000 0 140000
Financial Sanction Details
Financial\Administrative Sanction No: 129/59 Financial\Administrative Sanction Date 27/12/2013
Fin. Sanc. Amt. (in Rs) NREGA:56000 Panchparmeshwar
84000
Scheme 2
0
Scheme 3
0
Total
140000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Contingency110001000
3Dag-beling-Double spade "v" shaped stroke 100mm deep1230.449.2
4Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m27.8832.4903.312
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)19.782239.944305.222
6Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)14.911691.325217.283
7Labour only for item no. 0413 (for any proportion of cement concrete)34.69444.615423.174
8Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used19.78149.22951.176
9False work for R.C.C. and P.C.C. work in plinth and foundation73.9680.95983.364
10Labour only for item no. 043073.9651.43801.544
11Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)120.956725.7
12Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 27.886.2172.856
13Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 34.6936.51266.185
14Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.43.25128.075539.0275
15Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms.6.56300.281969.8368
16Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 50 Kms. and part there of upto 100 Kms.30.79571.2817589.7112
17Loading of metal in truck, dumper etc.27.8823.11644.3068
18Unloading of metal in truck, dumper etc.27.8811.88331.2144
19Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work79.5473.45838.236
20Collection of hard moorum including stacking at quarry.27.88118.33298.204
Total Activity 140000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL17.18120020616
240 M.M. METAL13.59649.148821.8126
3CEMENT(BEGS)18923043470
4contangency and work charges000
5Display board125002500
6FALSE WORK73.9680.95983.364
7joint filler for fixed120.956725.7
8MIxer Vibrator103003000
9mixer machin (perday)116006600
10SAND15.386009228
11Transportanion of hard Muram27.88161.284496.4864
12Transportanion of WATER for Mu27.886.2172.856
Total Material 106000