Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 04:28:42 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: DEVRIKALA(P)
Work Code: 1703004033/RC/22012034182323 (खरंजा निर्माण मैन रोड से करन सिंह तक)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/4/2013 Work start date : 12/9/2013
Present status : Earthern road Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 33/359 Sanction Date : 12/7/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
76767 35861.3 0 0 0 0 0 35900 0 112628.3
Financial Sanction Details
Financial\Administrative Sanction No: 33/24 Financial\Administrative Sanction Date 15/8/2013
Fin. Sanc. Amt. (in Rs) NREGA:112628 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
113000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Single spade stroke minimum 75mm deep1600.232
2Providing and fixing in cement mortar 1:6 (1cement, 6sand) flag stone slab over drains.-30 mm thick112218.624483.2
3Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.240215.751768
4Transportation rates for Masonry stone.36206.647439.04
5Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.55.94132.847431.0696
6Loading of metal in truck, dumper etc.26.2855.941470.1032
7Unloading of metal in truck, dumper etc.13.1455.94735.0516
8Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.55.94412293.54
9Collection of hard moorum including stacking at quarry.55.94130.87316.952
10Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Loose or soft soil.29612.83788.8
11contingency15870.535870.53
Total Activity 113000
S.NoMaterialQuantityUnit PriceTotal
1Convergence Amount15870.535870.53
2moorum55.94132.847431.0696
3Transportation charges36206.647439.04
4पत्‍थर फर्सी11213515120
Total Material 35900