State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: BADGAON PIPLOD
Work Code: 1725007005/IF/889 (कपिलधारा सह मेंढ बंधान कार्य झिंगूबाई गंगू बडगांव )
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 26/4/2011 Work start date : 30/4/2011
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 50a Sanction Date : 27/4/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
90000 60000 0 0 0 0 0 60000 0 150000
Financial Sanction Details
Financial\Administrative Sanction No: 1a Financial\Administrative Sanction Date 30/4/2011
Fin. Sanc. Amt. (in Rs) NREGA:150000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
150000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)65.87332.9921934.0513
2Dag-beling-Single spade stroke minimum 75mm deep6000.2120
3Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead195.39305861.7
4Labour only for item no.040274.3524.61829.01
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)4.722445.311541.816
6False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift87.56151.313247.828
7Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars148.2466817.2
8Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil38.1561.72353.855
9Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum57.2280.24589.044
10Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)31.79196.56246.735
11Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.148.86427.7963680.8194
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work37.361.42290.22
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Tank Work37.362.52331.25
14work charge171567156
Total Activity 150000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL.610006000
2Blasting (No)1508012000
3Board1500500
4Cement1285285
5Cement(bori)4830014400
6Centering and Shuttering87.56605253.6
7deasil pump000
8desal pump rent184508100
9MASON (PERDAY)93002700
10Photo copy712142
11Photograph520100
12Sand410004000
13SEND MOTARS000
14STEEL15045.356802.5
15Transpotation Charges05000
16गिटटी 20 एम एम000
Total Material 60300