Work Code: 1703004005/RC/22012034293825 (KHARANJA KENAL KI PULIYASE CHARAN SINGH KE DERA KI OR AND SHALA MANDIR GALI SE HOM SINGH KE VADA)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 11/11/2015 Work start date : 28/12/2015
Present status : Earthern road Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 005/3458 Sanction Date : 24/11/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
204163 125767 0 0 0 0 0 126000 0 329930
Financial Sanction Details
Financial\Administrative Sanction No: 005/4 Financial\Administrative Sanction Date 12/12/2015
Fin. Sanc. Amt. (in Rs) NREGA:329930 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
330000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard130003000
2Dag-beling-Single spade stroke minimum 75mm deep0.5500250
3Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.750226.1169575
4Transportation of 20 MM metal226.88200.6145514.3968
5Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms.112.5421.9447468.25
6Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.226.8844.110005.408
7Collection of hard moorum including stacking at quarry.226.88140.731922.016
8Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.80013.811040
9contingency11093010930
Total Activity 330000
S.NoMaterialQuantityUnit PriceTotal
1contangency14462.824462.82
2moorum224.23226.150698.403
3Sand for filling and road blin173.6200.6134825.896
4sign board120002000
5खण्‍डा परिवहन80.05421.9433776.297
Total Material 126000