S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 3000 | 3000 |
2 | Dag-beling-Single spade stroke minimum 75mm deep | 0.5 | 500 | 250 |
3 | Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar. | 750 | 226.1 | 169575 |
4 | Transportation of 20 MM metal | 226.88 | 200.61 | 45514.3968 |
5 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms. | 112.5 | 421.94 | 47468.25 |
6 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 226.88 | 44.1 | 10005.408 |
7 | Collection of hard moorum including stacking at quarry. | 226.88 | 140.7 | 31922.016 |
8 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil. | 800 | 13.8 | 11040 |
9 | contingency | 1 | 10930 | 10930 |