State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: SIGON
Work Code: 1711003050/RC/22012034285269 (NALI NIRMAN PRATHMIK SHALA BHAVAN SE PM SADAK KI PULIYA KI OR)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 17/8/2015 Work start date : 22/9/2015
Present status : No Road Proposed Status : Cross Drainage
Tech Sanction Details
Technical Sanction No. : 157/sig Sanction Date : 16/9/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
230000 148000 0 0 0 0 0 148000 0 378000
Financial Sanction Details
Financial\Administrative Sanction No: 03/sg Financial\Administrative Sanction Date 18/9/2015
Fin. Sanc. Amt. (in Rs) NREGA:378000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
378000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Contingency170007000
3Work charge14271318551
4Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m40.6435.81454.912
5Filling foundation and around masonry work with moorum I/c ramming layers and watering.45.1655.22492.832
6Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)5.083259.316557.244
7Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)45.161636.373895.308
8Extra rate for laying cement concrete in or under water or liquid mud including cost of pumping and bailing out and removing slush etc. complete.45.1678.13526.996
9Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand)91.451318.48120574.996
10TRANSPORTATION OF MATERIAL14008840088
11Collection of approved soil having CBR not less than 5, including stacking at quarry.45.1690.24073.432
12Collection of rubble masonry (size 0.014cum to 0.06cum) other then black trap, basalt or granite.91.45467.742771.165
13Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.29.36139.14083.976
14Site clearance, cutting grass, raking into heaps and removing off the premises225.81.6361.28
15Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil248.3888.321931.954
16Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading-3 (Size ranging from 53 mm to 22.4 mm)40.64455.718519.648
Total Activity 378000
S.NoMaterialQuantityUnit PriceTotal
120MM BT METAL4.3212005184
240 mm Metal40.64153.86250.432
3CEMENT(BEGS)25330075900
4contangency and work charges120002000
5Display board120002000
6PhotoCopy & Stationary110001000
7SAND60.9260036552
8Transportation of Masonry Ston75.93197.5414999.2122
9TRANSPORTATION OF MOORUM29.72138.424113.8424
Total Material 148000