S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling in foundation and plinth with sand watered and rammed | 1000 | 13 | 13000 |
2 | Labour cess | 100 | 2500 | 250000 |
3 | NSI DEWATERING OF POND | 35.34 | 146.648 | 5182.54032 |
4 | Construction of 6 inch dia type to drain | 100 | 777 | 77700 |
5 | Earth,Surkhi,Sand,Earth,Fly Ash,Bajri,Ballast,Stone Boulders,Kankar and Building Rubbsh, Earth 0.5 TO 1.0 km | 150 | 26.88 | 4032 |
6 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 and Tippers with Disposal up to 450 metres. Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead up to 450m | 350 | 539 | 188650 |