State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: BILANKHEDA
Work Code: 1725006013/IF/31 (कपिल धारा सह मेंढ बंधान मंगुत धन्‍नालाल (बिलनखेडा))
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2010-2011 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 18/2/2011 Work start date : 28/2/2011
Present status : Existing Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 00.1118 Sanction Date : 24/2/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
87000 44000 0 0 0 0 0 44000 0 131000
Financial Sanction Details
Financial\Administrative Sanction No: 00.51 Financial\Administrative Sanction Date 28/2/2011
Fin. Sanc. Amt. (in Rs) NREGA:131000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
131000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil43.1934.41485.736
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil192.1938.27341.658
3Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)161006100
4Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead96.09151441.35
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1:2 (1cement, 1sand, 2graded stone aggregate 20 mm nominal size)5.092445.312446.577
6False work for R.C.C. and P.C.C. work in plinth and foundation102125.112760.2
7Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars14346.36620.9
8Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil22.67161.71398.8007
9Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum22.67180.21818.2142
10Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)45.342192.858744.2047
11Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.168.3352.3259295.456
12work charge11100011000
Total Activity 131000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL126002600
2Blasting Holas80705600
3BULLOCK CART124004800
4Cement1250250
5Cement(bori)313059455
6Centering and Shuttering8890.67972.8
7Display board115001500
8metal(t)4.4761.53350.6
9RR stone (Granite)18080
10Sand2.2561.351234.97
11Sand (Filling)120002000
12STEEL14860.78983.6
Total Material 47900