S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 2048 | 1.7 | 3481.6 |
2 | Dag-beling-Single spade stroke minimum 75mm deep | 960 | 3 | 2880 |
3 | Transportation of metal | 1026.14 | 112.41 | 115348.3974 |
4 | Transportation of metal | 306.16 | 412.02 | 126144.0432 |
5 | Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-600mm dia | 25 | 964.4 | 24110 |
6 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 1388.34 | 21.6 | 29988.144 |
7 | Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor | 1384.104 | 23 | 31834.392 |
8 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work | 1246.296 | 87.3 | 108801.6408 |
9 | Collection of puddle earth including stacking at quarry | 1626.296 | 121.3 | 197269.7048 |
10 | Collection of hard moorum including stacking at quarry. | 1404.32 | 140.7 | 197587.824 |
11 | SIGN BOARD | 1 | 6000 | 6000 |
12 | Labour difference in case of old SoR | 325 | 159 | 51675 |