S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 1 | 200000 | 200000 |
2 | Labour only for cement lime mortar | 1 | 162000 | 162000 |
3 | Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing. | 615 | 211.4 | 130011 |
4 | False work for R.C.C. and P.C.C. work in plinth and foundation | 82 | 147.8 | 12119.6 |
5 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:4 (1cement, 4sand) | 387.45 | 1858.7 | 720153.315 |
6 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Raised and cut pointing | 861 | 127.6 | 109863.6 |
7 | Providing and fixing M.S. fan clamps of 16mm dia mild steel in existing RCC slab including cutting chase and making good. | 86.1 | 882 | 75940.2 |
8 | Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed | 688.8 | 96.2 | 66262.56 |