S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2500 | 2500 |
2 | Contingency | 1 | 27000 | 27000 |
3 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 146.089 | 131.4 | 19196.0946 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 130.23 | 2610.2 | 339926.346 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 20.21 | 1998.7 | 40393.727 |
6 | False work for R.C.C. and P.C.C. work in plinth and foundation | 308.37 | 116.2 | 35832.594 |
7 | Deduct for concrete unvibrated in item no. 0425 | 105.43 | 156 | 16447.08 |
8 | Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide) | 678 | 5.9 | 4000.2 |
9 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 105.43 | 5.2 | 548.236 |
10 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 105.43 | 29.2 | 3078.556 |
11 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work | 146.089 | 73.4 | 10722.9326 |
12 | 2502 ,318 earth work in bulk excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5nm with extra for every additional lead 50m to 200m | 0 | 0 | 0 |