Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:42:13 PM 
Back  
State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: KAITHORA
Work Code: 1711003043/WC/22012034545976 (Gravion structure chakra ke pass nala)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 16/4/2020 Work start date : 3/5/2020
Present status : Existing Proposed Status : Constr of Stone boulder Gully Plugs for Comm
Tech Sanction Details
Technical Sanction No. : 1711003/2020-2021/80819/TS Sanction Date : 4/5/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
136269.27 128485.01 12337.99 162779.87 0 0 0 304000 1900 441772.14
Financial Sanction Details
Financial\Administrative Sanction No: 1711003/2020-2021/80819/AS Financial\Administrative Sanction Date 4/5/2020
Fin. Sanc. Amt. (in Rs) NREGA:442060 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
443000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Labour only for dressing stones hammer or rough dressed for C. R. masonry work second sort.466477.809206008584222659.09
2Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height100085.1386685138.66
3(VI) 3.0 Km. Lead251.2139.2134952229334970.43
4b (iii) Dense or hard soil for Tank Work60134.18758051.25
5c (iii) Hard moorum for Tank Work60178.73783333333310724.27
6Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.466161.02575037.65
7Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works )13578.363578.36
Total Activity 441000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.018858.85
20084-Hire charges of Diesel truck - 9 tonne (without POL)8.4324224218905.4408
30367-Portland Cement0.02895511159.2679
40368-White cement 0.0004157446.2976
50983-Fine sand (zone IV)0.0471076.2550.58375
61004-Average rate of mild steel round bars for reinforcements3.8532519220005.8144
71008-Flats up to 10 mm in thickness6.8807472032476.904
81215-Welding by electric plant2752.29361.183247.706448
91235-Diesel oil70.4102684787.8936
105001-Mobil oil2.5297182.9462.68213
116-Labour welfare fund/Cess119001900
127900-Modular common burnt clay bricks of class designation 7.5244.44.131009.372
13MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT0.06552534.125
14MR6032-Snowcem/ durocem0.00072778919.4523
15MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.02468216.368
Total Material 83100