S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 150 | 21.9 | 3285 |
3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 124 | 35.8 | 4439.2 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 0.58 | 3089.9 | 1792.142 |
5 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 0.58 | 169.4 | 98.252 |
6 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 57 | 1043.6 | 59485.2 |
7 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand) | 3.52 | 2005 | 7057.6 |
8 | Providing and fixing fine dressed cut stone lintels of any size including setting in C.M. 1:2. | 1.55 | 11257.5 | 17449.125 |
9 | Add extra for brick masonry circular in plan, I/c wells to a mean radius not exceeding 6m (Such as well stening and other similar type of works) | 90 | 265.5 | 23895 |
10 | Add to item no.0605 and 0609 for well staining-For every 3meter up to 15 meter depth. | 57 | 172.3 | 9821.1 |
11 | TRANSPORTATION OF MATERIAL | 1 | 7368.62 | 7368.62 |
12 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Ruled pointing | 20.15 | 83.1 | 1674.465 |
13 | Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading - 1 (Size ranging from 90 mm to 45 mm) | 8 | 240.6 | 1924.8 |
14 | Add in item No. 2401 for lift. (In well excavation)-For every 0.50 m after 1.5 m initial depth upto 6.0 m | 150 | 7.1 | 1065 |
15 | Add in item No. 2401 for lift. (In well excavation)-For every 0.50 m after 6.0 m initial depth upto 10.5 m | 80 | 9.4 | 752 |
16 | Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 1.5 m initial depth upto 6.0 m | 70 | 10.6 | 742 |
17 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 150 | 81.2 | 12180 |
18 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work | 150 | 119.7 | 17955 |
19 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard moorum for Well Work | 80 | 130.2 | 10416 |
20 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Well Work | 70 | 353.2 | 24724 |
21 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Hard rock requiring blasting for Well Work | 50 | 477.2 | 23860 |
22 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 9 | 100.3 | 902.7 |
23 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 8 | 139.1 | 1112.8 |