Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 25-Jun-2024 12:45:19 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: BADKISARAI(P)
Work Code: 1703004047/IF/22012034428518 (nadep compost pit naval singh / gambhir singh)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2018 Work start date : 6/8/2018
Present status : Not Exist Proposed Status : Constr of Single Unit Toilets for Individual
Tech Sanction Details
Technical Sanction No. : 184/047 Sanction Date : 19/6/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
10203 6797 0 0 0 0 0 6800 0 17000
Financial Sanction Details
Financial\Administrative Sanction No: 18/047 Financial\Administrative Sanction Date 25/6/2018
Fin. Sanc. Amt. (in Rs) NREGA:17000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
17000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil3.296.2307.84
2Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.1.88821587.6
3Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing.0.53307.41653.7
4False work for R.C.C. and P.C.C. work in plinth and foundation1.8147.8266.04
5Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.5.610796042.4
6Pointing on CR masonry with cement mortar 1:4(1cement, 4sand)-Flush pointing21.668.21473.12
7Transportation of sand10.2330.73373.14
8SIGN BOARD110001000
9contingency11296.161296.16
Total Activity 17000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. B.T. METAL0.341310445.4
240 M.M. METAL1.6132.7212.32
3CEMENT2310620
4Display board1999.66999.66
5MURROM2.7123332.1
6P V C PIPE131121456
7patthar000
8SAND0.22880193.6
9Transpotation Charges5.6453.22537.92
Total Material 6800