S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Dag-beling-Double spade "v" shaped stroke 100mm deep | 745 | 0.5 | 372.5 |
2 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 117.07 | 638.8 | 74784.316 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal) | 95.55 | 3194.2 | 305205.81 |
4 | False work for R.C.C. and P.C.C. work in plinth and foundation | 150 | 132.5 | 19875 |
5 | Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide) | 180 | 6.2 | 1116 |
6 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:5 (1cement, 5sand) | 20.4 | 2849.4 | 58127.76 |
7 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms. | 95 | 703.1 | 66794.5 |
8 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 1 | 32027 | 32027 |
9 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 50metres and upto 1.5metre.-Dence or hard soil | 30 | 11.2 | 336 |
10 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 472.5 | 31.2 | 14742 |
11 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 405 | 87.3 | 35356.5 |
12 | Field Technical Supervisior Charge-FTSC | 1 | 19000 | 19000 |